As a specialist discipline, factory planning describes the holistic design of industrial production sites throughout the entire lifecycle of a plant. It combines spatial structure, machine and building technology, material and information flows, as well as organizational processes into a goal-oriented system. In this context, value creation analyses and concrete production programs serve as the starting point for space requirements, capacity dimensioning, and interface design. Variants are systematically generated and evaluated based on quantitative criteria to minimize investment risks and reliably estimate subsequent operating costs.
Goals and Benefits
A consistent planning process aims to optimize efficiency, quality, and operational safety. Through a structured examination of material flow, warehousing, and utility engineering, lead times can be shortened, inventory costs reduced, and resources used more efficiently. In parallel, comprehensive documentation provides the basis for compliance with legal requirements, audits, and validation requirements; this is of significant importance, particularly in regulated industries.
Typical benefit areas include:
- reduced costs via lifecycle considerations
- improved asset utilization and reduced downtimes
- clear evidence tracking for quality and compliance
A targeted KPI structure supports the measurability of improvements and makes planning results comparable.
Methodology and Tools
In terms of methodological design, established phase models are combined with digital modeling procedures. Initially, all relevant data is recorded; based on this, block and rough layouts are created, which are refined in several iterations and finally converted into 3D models. Simulation methods allow for the quantified evaluation of throughput, inventories, and bottlenecks, while digital twins enable planning-related tests under varying boundary conditions.
Common tools include:
- 2D and 3D CAD models for spatial coordination and collision checking
- discrete-event simulations for throughput analysis
- digital twins for mapping control, maintenance, and OEE metrics
At the same time, Building Information Modeling (BIM) supports the integrated planning of architecture, building services, and production technology. As a result, planning assumptions become validatable earlier and the consequences of changes become manageable.
Practical Modules and Typical Steps
A field-tested project sequence is divided into interlocking work packages that take technical, organizational, and regulatory perspectives into account. On a strategic level, site roles, network strategies, and investment frameworks are defined, and in the concept phase, spatial structures, logistics principles, and safety scenarios are established.
The detailed planning includes utility connections, ergonomics, cleaning and maintenance concepts, as well as documentation for qualification measures. Important: Important: Before process validation, equipment qualification (IQ/OQ/PQ) always takes place. First, the qualification of the equipment occurs (Installation and Operational Qualification); the Performance Qualification (PQ) then builds upon this as a necessary basis for the actual process validation. Finally, construction execution and the FAT/SAT tests are carried out.
Key work packages can be summarized as follows:
- Strategic preliminary planning: site analysis, production program, economic feasibility study
- Concept planning: block layout, material flow, logistics and utility concepts
- Detailed planning: 3D layout, media and safety technology, ergonomics
- Realization and commissioning: assembly, FAT/SAT, qualification (IQ/OQ/PQ), and process validation
Close coordination with suppliers, authorities, and internal departments reduces interface risks and accelerates project progress.
Industry-Specific Requirements and Validation
Requirements differ significantly depending on the product category. In pharmaceutical and medical technology, special attention is paid to cleanroom classifications, validated production processes, and seamless documentation. Aseptic filling processes based on Rommelag Blow-Fill-Seal technology (BFS) and the associated bottelpack systems - where containers are formed, filled, and sealed directly in a single operation within the machine - require exact coordination between machine layout and the cleanroom shell.
In BFS technology, sealing is performed thermally and directly in the mold, which minimizes the risk of contamination compared to conventional vials (with stoppers and crimp caps), as hermetic sealing occurs thermally immediately after filling within the mold - without contact with external closure components. Important: The BFS system is an aseptic process that actively maintains the sterile state of the product until sealing, while upstream sterilization actively creates this state. Due to the closed system, however, the requirements for the cleanroom environment are significantly reduced. Annex 1 specifies specific zones here (Grade A in the critical area, background often Grade C), provided the design ensures a strict separation of personnel and material flows.
The following points should also be mentioned:
- Validation strategy: test concepts for IQ, OQ, and PQ with clear acceptance criteria;
- Risk analyses: FMEA-supported identification of critical process steps;
- Supplier integration: early coordination of machine connections and service zones.
Intralogistics, Warehouse Concepts, and Material Flow
The design of internal transport routes and buffer systems sustainably influences efficiency and lead times. Based on value stream analysis, block layouts can be developed that relate central flow axes and buffers to one another. Depending on batch sizes and the degree of automation, different warehousing strategies make sense: from chaotic pallet warehouses to automated small parts warehouses and Kanban-supported container circuits.
Relevant design questions are:
- Where should buffers be used to balance cycle time differences?
- Which conveyor technology reduces handling effort and error rates?
- How can material supply be designed ergonomically and safely?
Energy, Utility Engineering, and Sustainability
Energy consumption, media supply, and strict environmental requirements are of growing importance. Energy flow analyses, load management, and potential recovery measures must be considered as early as the initial planning phases. Technologies for heat recovery, efficient compressed air systems, and the centralization of supply infrastructure reduce operating costs. Furthermore, topics such as CO₂ footprinting and the circular economy influence site decisions and spatial design. A precise Life Cycle Cost (LCC) analysis helps to weigh CAPEX against OPEX.
Organization, Personnel, and Ergonomics
The design of workstations must minimize the strain on employees while enabling productive processes. Ergonomic checks, access areas for maintenance, and training areas are an integral part of detailed planning. Additionally, flexible production concepts require altered qualification profiles and concepts for shift planning and maintenance. Knowledge management measures and structured onboarding plans support a smooth production start.
Digital Transformation and Automation
Automation solutions and the integration of IT systems are sustainably changing planning principles. Shop-floor IT, MES integration, and IoT sensors provide real-time data that brings planning and operation closer together. Based on this data, predictive maintenance strategies are implemented, which reduce unplanned failures and increase availability. Furthermore, automated layout optimization procedures enable large variant spaces to be searched efficiently and multiple target variables such as cost, time, and energy to be optimized simultaneously.
Risk and Change Management
Every planning project requires structured change management that makes technical, scheduling, and financial impacts transparent. Evaluation matrices, escalation rules, and documentation processes used early on minimize wrong decisions and ensure traceability towards stakeholders and regulatory authorities. In addition, sensitivity analyses and scenario planning help to test the resilience of the chosen solution against uncertainties.
Future Perspectives
Further development tends toward flexible, data-driven factory structures that are modularly expandable and can adapt to volatile demand profiles. Digital twins are increasingly operated in real-time, meaning planning approaches increasingly influence ongoing operations. In addition, the overall view of production, logistics, and supply networks is moving into focus to increase resilience against disruptions. In conclusion, it is expected that sustainability and compliance aspects will be even more strongly integrated into economic decisions in the future.